Project info

  • Client : Jones Electric
  • Tag : Grid Connections
  • Date : June 2026
  • Status : Complete

Description

Project: Starbucks Crieff – Rapid EV Charging Infrastructure
Location: Crieff, Scotland
Network Operator: SSE
Asset Adopter: Last Mile Asset Management (IDNO)

Overview

Delivery of a new 200 kVA LV connection to power a 160 kW rapid electric vehicle (EV) charger at a high-footfall Starbucks retail location in Crieff. The project was commissioned to meet growing consumer demand for ultra-fast charging on the Scottish road network. Working in strict coordination with SSE (Distribution Network Operator) and Last Mile Asset Management (Independent Distribution Network Operator), we designed and installed a fully compliant, adoptable infrastructure asset designed for immediate operational deployment and long-term scalability.

Scope of Works

Scope of Works

  • LV Network Feasibility: Capacity analysis and headroom validation on SSE’s existing LV cable network to confirm viability of the 240 kVA load.

  • Full LV Electrical Design: Production of schematic diagrams, protection coordination studies, and metering configurations in accordance with SSE’s Distribution Code.

  • Civil Infrastructure Package: End-to-end design and installation of charger foundations, heavy-duty ducting, and below-ground cable containment systems.

  • Cable Route Engineering: Planned and executed the LV cable route from the SSE point of supply to the EV feeder pillar, mitigating third-party utility clashes.

  • Cut-out Termination: Safe, certified LV termination into the bespoke EV feeder pillar, ensuring IP-rated weatherproofing and accessibility for maintenance.

  • Testing & Commissioning: Comprehensive insulation resistance, polarity, and loop impedance testing, followed by live load-bank validation to verify charger performance under peak demand.

Technical Highlights

  • System Coordination: Integrated seamlessly with SSE’s existing LV network; designed to maintain voltage drop threshold at full load (160 kW) to ensure charger efficiency.

  • Asset Adoption Compliance: Engineered strictly to Last Mile Asset Management’s IDNO adoption process, covering material specifications, earthing arrangements, and as-built documentation for seamless transfer of ownership.

  • Civil Durability: Specified reinforced concrete plinths and high-impact ducting to withstand heavy vehicle manoeuvring and Scottish weather extremes, minimising future maintenance interventions.

  • Future-Proofing: Infrastructure designed with the potential for dynamic load management or increased capacity without significant civils rework.

Outcome

The project successfully delivered a fully operational, high-capacity rapid charging hub for Starbucks and their customers, supported by a robust, adoptable LV asset.

  • Business Impact: Enables the site to attract EV-driving customers, increasing dwell time and average transaction value through rapid charging sessions.

  • Operational Reliability: Infrastructure tested and commissioned to SSE and IDNO standards, ensuring >99.5% availability for the EV charger with minimal reactive maintenance requirements.

  • Asset Value: Provided Last Mile Asset Management with a turnkey, compliant IDNO asset, complete with full O&M manuals and CAD as-builts, ready for long-term regulatory audit.

  • Sustainability: Directly supports Scotland’s commitment to phasing out new petrol/diesel cars by 2030, providing essential grid infrastructure to enable the EV transition in rural regions.

Our Client Review

TriEnergi's ICP-led approach delivered exactly what we needed at Crieff – speed, cost certainty, and complete peace of mind. Their technical team navigated SSE's grid compliance requirements with precision, and the 200 kVA installation was seamless from civils through to commissioning. The rapid charger is already performing above expectations, and we look forward to working with them on future projects.

Martin Jones, Managing Director, Jones Electric (Doncaster) Ltd